top of page

Loading Docks and Infrastructure

 

Location: Camp Hartell, Windsor Locks, CT

 

Range: $500K - $1M

 

Length/Term: 8 Months

 

Project Description: Design, layout and installation of truck loading dock at the New England Disaster Training Center.

Erosion Control and Sediment Ponds

 

Location: Camp Hartell, Windsor Locks, CT

 

Range: $500K - $1M

 

Length/Term: 6 Months

 

Project Description: New stormwater conveyance and management improvements.  Installation of 5 new storm water retention ponds.

 

Repair Fan Coils and DDC Units

 

Location: Berry-Rosenblatt Army Reserve Center, West Hartford, CT

 

Range: $2.5M - $5M

 

Length/Term: 2 Years

 

Project Description:  Energy saving upgrades to existing HVAC system.

bottom of page