Steel
Repair/Renovate - Building 150
Location: Robins Air Force Base, Warner Robins, Georgia
Range: $5.5M - $6M
Length/Term: 1 Year, 3 Months
Project Description: Replaced original roof (1944) along with new metal structures, removed hazardous materials and enhanced safety and functionality for mission operations.
Install/Construct New Facility - Building 189 (Active)
Location: Robins Air Force Base, Warner Robins, Georgia
Range: $2M - $2.5M
Length/Term: 1 Year, 7 months
​
Project Description: Installing/constructing the new building (Building 189).
Repair Exterior Walls and Hurricane Preparedness
Location: Malcom Randall VAMC, Gainesville, FL
Range: $6M - $6.5M
Length/Term: 1 Year, 11 Months
Project Description: Assessed/upgraded rooftop protections, replaced outdated components, enhanced anchorages and storm pipes, added new protections and monitored/documented progress on all work performed.
Navy Exchange (NEX) Food Court Expansion - Building 987
Location: Naval Air Station, Jacksonville, FL
Range: $3M - $3.5M
Length/Term: 2 Years
Project Description: Demolished and/or removed specific existing exterior and interior structures and fixtures. Expanded and renovated areas around food court that included a new single-story addition with outdoor dining area.
Replace Muskie Chiller
Location: Edmund S. Muskie Federal Building, Augusta, ME
Range: $1.5M - $2M
Length/Term: 1 Year, 1 Month
Project Description: Removed existing water-cooled chillers, pumps, cooling towers and selective interior demolition. Replaced with new roof-mounted chillers, new steel structural support frame, new pumps, heat exchanger, all necessary piping and associated electrical and interior patching work.